The first batch of monitoring points in a certain district have completed optical fiber cutover, and the old copper cables have been kept in parallel for two weeks
In a certain district, 68 aging monitoring points completed fiber optic cutover and went online, and the new links were kept in parallel with the old copper cables for two weeks. This article records the practical operation of night window switching, the acceptance arrangements for centralized convergence of computer room racks and point-by-point light receiving power comparison.
2026-02-21
1302
Industry