In the update of this month's plan page, EB-LINK has packaged dormitory and classroom FTTR to room equipment, and assembled three types of goods according to room terminals, floor boxes, and classrooms to fill the material gap of POL all-optical network from shaft to room.
What's in the kit
room sideGigabit single mode dual fiber one optical one electrical fiber optic transceiverThis type of terminal is mainly equipped with SC head pigtails and jumpers; when there are many terminals in classrooms, it is equipped with a small device with one optical and four electrical models for folding tables; it is used in floor boxes and weak current cabinets14-slot box transceiver rackCentralized placement brings power supply and alarms together, replacing scattered placement. The amount of jumper wires in each set is proportional to the number of rooms. Generally, two extra jumpers are prepared for every ten rooms. Odd gaps will be reissued according to the grid. No need to ask for replacement parts if they are lost.
Which piece of missing material is being supplemented?
- The materials used in the dormitory renovation of single rooms are highly consistent, and applying for packages by building can avoid missing items when placing orders one by one.
- The AP, screen projector, and terminal computer on the classroom side compete for interfaces, and one light and four electricity are solved at once.
- Floor box space is limited, and rack integration allows for heat dissipation and maintenance distance to reduce equipment stacking.
- The pigtail and jumper head shapes are locked once in the kit sheet, and can be put on the shelf for construction upon arrival.
Ordering method and delivery date
Kits are delivered by building: first report the number of floors, number of rooms and terminals on each floor, and compareCampus network and FTTH integrated cabling solutionFill out the list in the format of the page. The regular parts are usually shipped within three working days. The customized coding module will be followed up in batches according to the testing rhythm. When confirming the inventory, check the SC and LC head types and pigtail length simultaneously to avoid secondary material changes after arrival.
For projects in the design stage, you can first request a kit list template and align the material diameters before starting work. If you need assistance, please call 0755-83179002.