Recently, in response to the adaptation issues that have been reported on the project side when domestic substitution and equipment source change occur, EB-LINK has opened a special consultation channel for optical module compatibility coding and source change evaluation. Technical support engineers will connect during working days, and the key points of the evaluation will be synchronized into the stocking plan.

Three types of questions focused on the project

  • Can the brand and model of the existing switch be coded accordingly, and whether the port matrix identification is normal?
  • How to determine the number of pilot batches, how long to observe, and what indicators to look at before drawing conclusions
  • How to ensure the consistency of the old and new batches after the source change, and how to maintain the ledger continuity?

The three types of problems point to the same core: the risks of changing sources must be digested through pilots and data, and commitments cannot be made solely by catalog parameters.

The basis of service capabilities

The company's entire series of optical modules can be customized with free coding according to brands such as Cisco, Huawei, H3C, ZTE, Ruijie, etc. Each module is tested one by one before being shipped, and the actual measurement data is issued with the goods. For source replacement projects, these two can shorten the compatibility check chain and provide a basis for batch traceability. There is no need to rely on experience to judge whether new and old materials can be mixed. For renovation projects with tight construction schedules, matching jumpers and adapters can also be packaged according to the link list to reduce the docking costs caused by multi-party procurement.

How to apply and follow-up arrangements

You can call 0755-83179002 or email sale01@eb-link.com.cn to explain the computer room environment and proposed replacement goals, and apply for pilot samples; for models on sale, you can firstProduct classificationCheck the stalls on the list page. The evaluation conclusion is usually answered within one working day, and the number of pilots and observation indicators are given together. In the next step, the company will organize the typical questions in the consultation into interpretations and publish them onNews listand knowledge base pages for reference for similar projects.