The needs of building renovation projects are often small and fragmented: twenty weak current rooms are connected, a few households change speeds, and a few spare jumpers. EB-LINK has recently organized tenant access spare parts packages by floor scale, stocking transceivers, SFP optical modules and jumpers in complete sets, and commonly used combinations can be shipped out on the same day.
What is the logic for arranging spare parts packages?
The basic package is configured with twenty access points in a single layer, including severalGigabit single mode dual fiber one optical one electrical fiber optic transceiver, LC jumpers and Gigabit single-mode modules; the upgrade package adds a one-optical four-motor model and a 10G module, corresponding to conference room convergence scenarios; the spare parts package focuses on jumpers and pigtails for tenants to use at any time when making changes. The three gears are all balanced according to the single-layer scale to avoid stocking too many jumpers of a certain type.
Why do tenant-side scenarios separately?
- The pace of building renovation is fast, and a missing jumper may delay the acceptance of the entire floor.
- Single-mode is used for the weak current room side, and multi-mode is used for short distances in the computer room. The specifications must be in complete sets rather than made in single order.
- Spare parts must be of the same model as the existing plan. After the tenant changes, common parts cannot be found at the opposite end.
How to implement the supply process
The project party provides the number of floors and port scale, checks the spare parts list according to the existing ledger, and after confirmation, it is packed and shipped and a packing list is attached with the goods;SFP Gigabit single mode dual fiber 10KM optical moduleOn the side, you can write preset codes according to the brand of the network switch. A port comparison table is included with the goods, so that the property management can replenish the goods according to the number. The EB-LINK technical team will assist in verifying the pairing of the A/B side of the transceiver on working days. Tel: 0755-83179002.
The spare parts package is open to building integrators and property engineering teams. Projects that need to be delivered in stages can be issued in batches by floor. It is recommended to test one layer according to the sample layer first, and then roll it out to the entire building after verification.